Mercy Hospital
A study report of cost savings over three years after installing an MHD unit.
A New Focus on Energy Efficiency: clean and green energy savings
MHD units use magnetic applied-field technology that is scientifically designed, tested and proven over time. They improve performance, save money and reduce environmental impact.

High-density rare-earth permanent magnets provide water treatment without chemicals. They remove existing scale, prevent new scale and work on both organic and inorganic scale.
Charged particles soften existing scale.
The softened scale is worn away by the fluid flow.
Small particles settle as fine sludge in the sump and leave through blowdown.





The MHD unit spreads apart the hydrocarbon molecules in fuel, which gives a larger surface area. The result is more complete combustion, lower emissions and fuel savings.



Removes existing scale and prevents new scale from forming.
Lower energy, fuel and labour costs.
No moving parts and no power connections. Simple, fast installation.
Non-polluting. Reduces or eliminates anti-scaling chemicals.
Less downtime and better equipment performance.
Low capital investment with a lifespan of 100+ years.
Equipment lasts longer and performs better.
Helps with pollution reduction and environmental compliance.
MHD improves performance, saves money and lowers environmental impact. Chemical treatment brings ongoing costs for chemicals, equipment, labour, storage, handling and disposal.
| Factor | MHD Technology | Chemical Treatment |
|---|---|---|
| Ongoing chemical costs | None | Required |
| Power / electrical connections | None | Energy costs |
| Labour & maintenance | None | Required |
| Storage & handling | Self-contained | Chemical storage |
| Dosage monitoring | Not needed | Monitor & regulate |
| Disposal | Environmentally green | Proper disposal required |
| Lifespan | 100+ years | Ongoing purchases |
MHD is approved after testing at a US Department of Energy geothermal facility, and by Japan's Department of Energy after 10 years of testing.
| Client | MHD Investment | Annual Savings | Return |
|---|---|---|---|
| Edfu Sugar Mill, Egypt | $60,000 | $683,000 | 11.4× |
| US Oil Producer, California | $20,000 | $255,000 | 12.8× |
| Japanese Ferry | $8,000 | $100,000 | 12.5× |
| Korean National Railway | $50,000 | $100,000 | 2.0× |
| World's Largest Laundry, CA | $12,000 | $62,000 | 5.2× |
| Mercy Hospital, Iowa | $6,700 | $63,800 (3 yrs) | 9.5× |
| Miami Airport, HVAC Unit | $12,000 | $12,400 | 1.0× |

A study report of cost savings over three years after installing an MHD unit.

Tokyo Dome uses multiple MHD units in its HVAC systems.

MHD units installed on an offshore drilling platform.

Controls scale and marine growth in a heat exchange system.
U.S. DOE Test Facility, East Mesa, California. Report by Bill J. Witt.
Problems: hard scale in the heat exchanger, cooling tower and plumbing, causing inefficiency, frequent downtime, lost production and higher operating costs.
Valves fully clogged
Valves fully open, full water flow, no scale buildup
Ask us how an MHD unit could cut your energy, fuel and maintenance costs.